1 Summary

TOTAL REPORTS 166
DUPLICATES 10
FEATURE REQUESTS ADDED (also see What's New - 2.1.1)
NO FAULT FOUND 55
RESOLVED 100
WON'T FIX / CHANGE 3
ADD ON MODULES

2 Duplicates

2259 GACL_AXO Table not being updated
2279 Task dupplication on Gant Chart
2325 one task appears several times in GANTT
2324 Date() expects parameter 2 to be long...
2341 Warning: date() expects parameter 2 to be long
2342 Importing Project Tasks from Template breaks Dependencies
2345 sendmail: Can't send mail
2365 Start and end dates for child tasks are not bound by the dates of the parent task
2448 Using $this when not in object context in /opt/lampp/htdocs/dotproject/lib/PEAR/Date/Calc.php on line 1603
2460 MySQL error when editting a project and no "end date" is specified

3 Feature Requests Added

2217 Added Events tab on the Project Summary display

4 No Fault Found

2246 Can not Add/Save Tasks
2255 Gantt Graph not displayed in projects module but displayed ok in ProjectDesigner
2206 Selecting a style / theme doesn't seem to respond in dp 2.1
2268 "All" Tab not working on Projects list
2278 Forbidden error
2270 Wrong variable on project stats
2275 'Problem' icon not shown on parent task when collapsed
2292 The Gantt chart under the Tasks tab is not displayed
2289 Unchecking "Check Task Dates" in Sys Prefs causes PHP error
2282 attempt to join on non-existant table user
2308 Tickets dont show up in a project?
2307 I can't log in.
2280 Task Reminders come with UTF-8 problems
2319 "show full project" not working properly
2337 Fatal error in files module
2336 Abbreviate week days in calendar (non-EN locale)
2334 Crash n Files Module
2312 TODO>> My Gnatts Problem
2359 Upload file size is zero
2366 Last tasks created are repeated in the Ganntt chart
2360 User does not see the event he created
2370 no delete option in Contacts
2354 mkdir() [function.mkdir]: Permission denied
2355 error on Tasks tab
2381 new taks log only when taks edit allow
2368 Reports --> Task list, Task log, Overall Report --> Make PDF error
2379 Files - Move to Folder / bulk option not working
2310 Errors in libmail.class.php
2338 Email headers are double-spaced. Duplicate "Subject" header.
2340 Gantt chart: incorrect cyrillic letters representation
2390 Tasks Log Calendar shortcomings
2392 Can't save a task
2362 Calendar dates not on correct day of week
2376 new event option on PROJECT display only - once a project is selected it remains selected forever
2394 Cannot add new HISTORY event
2400 Only one contact showed in task view
2398 Task Permissions causing error in Day View
2406 Cost Code Filter inoperative
2407 Bug in Project's contacts
2408 tabs in Companies section don't (correctly) reflect customizations made to CompanyType
2404 Error encountered when editing an existing project and adding a description
2411 calendar week shown wrong in week-view
2410 ERROR on login page
2415 Cannot delete projects
2423 Files rights are different from the belonging tasks
2424 error inserting task when "Check Task Dates" is turned off.
2432 Suggestion for V3
2434 copy assigned workers on task import
2439 AD (LDAP) integration breaks with upgraded 2.0.4 to 2.1.1
2441 Unable to load the files.
2446 Speed up project view several hundred times with many projects
2443 Accessing files on project fails
2451 viewgantt in projects module
2456 The field task_percent_complete do not accept 100.00%
2464 Calendar day starts week with Tuesday

5 Resolved

2241 New task - tabs switching is buggy in IE6 (Details, Dates, Dependencies, Human Resources)
2244 Single project gantt shows duplicates for some tasks at end of display
2245 Some email headers are shown in the message body
2247 projects_tab.events shows events NOT assigned to projects
2248 File downloads of some files results in corrupted files
2220 Copying / Moving Tasks - Losing Relationships / Dependencies but keeping "settings"
2251 File URL in file update notification mail is wrong.
2254 Forum Permission Bug (PHP error on $perm)
2250 LDAP created users do not inherit default user preferences
2252 Projects with empty end dates cannot be updated.
2265 Calendar Window Popup
2267 Departmental Gantt Charts not displaying
2187 Error in display of "no dates" on Gantt Chart
2264 Project Count (n) on tabs does not reflect filtering as a result of permissions
2258 UTF8 Problems and solutions
2271 Fatal error in session write on Forgot Password redirect on some versions of MySQL
2253 Tasks Listing > Close All Task either failing silently or reporting Max Timeout Error
2249 Problem in mail header line wrap
2283 Syntax error: Missing '.' in modules/tasks/view.php
2284 Todo page SQL error when viewing other persons todo list (fix included)
2277 PDF projects reports do not work when locale is not english
2261 Folder view problems with files.
2290 Attempt to add Contacts to Project gives runtime error
2291 Project Contacts assignment does not work properly
2303 Restrictive permissions can cause SQL error in project listing
2299 Files Module - No of Files on tab(s) calculated incorrectly
2297 Companies > Files Tab not displaying
2281 Fatal Error
2294 editing project contacts only saves the last change, removing all other contacts
2330 Email to some SMTP servers fails to send
2296 Layout of Permissions on a User Account is incorrect
2287 Project lists longer than 1,000 projects take over 30 seconds to load
2326 Permissions missing for file_folders on install
2304 setting up a new department
2273 Integer Custom Fields are not stored properly when empty.
2318 Trouble on tasks' description after copying tasks
2344 Fatal query error
2353 SMTP Authentication Failure
2346 Incorrect file count
2343 FIX: Incorrect file versions list
2328 Create Sub-Folder in Folder Explorer / Click on that folder name returns error
2357 FATAL PHP error in tasks.class.php @ line 212
2361 Bug when assign explicitly a task to a user.
2329 Cannot create a file in a sub-folder
2311 Project Listing > Project Priority has changed behaviour
2323 Installation can't handle non-default SQL modes
2305 Tasks Per User Screen not honouring permissions
2378 Import vcard showing an odd company name
2269 When editing a task, after it's been added, the Start Date is getting dropped
2348 Display / Processing of Parent Tasks isn't correct in current CVS
2300 Inconsistency in Company / Departmental Displays
2301 User Project Tab Inconsistency
2371 tasks sorted by user report - wrong date format
2377 Project Listing - Status column not sortable
2382 Project Detail > File Tab display showing error when a new file has been added
2385 Files > Folder Explorer > Error on folder explorer
2384 Files > Folder Explorer > Click on icon beside sub-folder name shows an error
2295 SmartSearch results not honoring permissions
2373 Today (Day View) > Projects Tab > Statuses not all showing
2375 Tasks from archived project still showing in some locations
2396 FATAL SQL error Invalid syntax 'f.OR file_task = 0'
2356 Unable to create departments
2264 Project Count (n) on tabs does not reflect filtering as a result of permissions
2374 Reports option from main Tasks listing has a slightly "odd" default project set
2383 'Copy' in 'Organize Tasks' does'nt copy the task dependencies
2320 Giving a user permissions to a company does not work right when PHP magic quotes are off
2395 dotProject not honoring default view configuration
2388 Item Permissions in Roles NQR
2331 dates and dependencies messed up when importing tasks
2387 Milestone Tasks Unable to Have a Zero Duration
2402 milestones fall in the wrong place on gantt chart timeline
2416 Typo in /modules/tasks/vw_log_update.php
2302 User Permissions Items not reflecting changes in names
2418 Error Displayed on Project Screen after update to revision 5718
2422 stable2: gantt not displayed due to spaces at end of overrides.php
2403 History Module Task Log Url Fix
2427 Final version on files Check-in fails
2428 Today List > Column Sorts not sorting / jumping to alternative pages
2430 Errors & Oddities Related to "Check Task Dates"
2431 Readme file needs updating
2314 Reports have gone missing
2401 When copying or moving the task the task logs are not copied or moved. The percentage also not retained
2386 Calendar > Clashing Appointment Handling > Mail Request not working
2440 Updated Simplified Chinese language pack
2442 Only last custom field displaying if multiple fields defined for a page
2447 Using $this when not in object context in /opt/lampp/htdocs/dotproject/lib/PEAR/Date/Calc.php on line 1603
2444 gantt charts of tasks
2452 Script error in admin/vw_user_log.php
2450 Table 'files_count_max' already exists
2455 Listing of files in project module
2454 Task-level file display is inconsistent
2435 Make "public" access type less public
2458 SQL Error in Files module with permission in specific Projects
2459 Column ambiguity SQL in Projects module with permission in specific Projects
2445 'Task Notification Method' preference is not honoured
2457 gantt chart in tasks module doesn't show captions
2437 Files Module - No of Files on tab(s) calculated incorrectly
2461 German "Umlaut" (special characters) wrong in pdf reports
2358 Subject is in the email TO field
2465 Custom Fields containing HTML special chars display incorrectly

6 Won't Fix / Change

2272 Tickets Table changes
2389 Various HTML fixes (incorrect tag nestings, etc.)
2298 UTF8 Problems with database